T&m

What is T&m?


1.

time and material.

how much labor(time) and how much material is necessary to complete the job

this job will be $10 an hour for 10 hours plus $50 worth of material equals a total job cost of $150


29

Random Words:

1. A combination of drama and meter. A measure of how much drama is occurring during a situation. Dude, the drameter was registering a 9.5..
1. Verb. Organized Old English way of spelling. Modern equivalent: Organised. However, Colonial countries have not evolved yet so spell t..
1. Wrong, Nitrox is used at shallower depths to allow for LONGER bottom time with less Nitrogen build-up in the tissue, it also requires ce..