T&m

What is T&m?


1.

time and material.

how much labor(time) and how much material is necessary to complete the job

this job will be $10 an hour for 10 hours plus $50 worth of material equals a total job cost of $150


29

Random Words:

1. the acronym for uncontrolable thing without a brain The reason they called him an utwab is because of his behavior See crazy, uncontro..
1. To get kozed means to be relaxed. -verb- I want to go home and get kozed. See comfortable, relaxed, snug, loose 2. 1. To completely..
1. A lesbian dinosaur. "Kathy is the captain of her softball high school team". "Yea, I think she is a lick a lot o puss&q..